Portfolio Category: Port

Marina Piling Repair

ELS was contracted by the Port of Bremerton to obtain permits for the maintenance and repair at the Bremerton Marina. As part of the permitting process, ELS prepared the environmental permit applications required by the U.S. Army Corps of Engineers (Corps), Washington Department of Fish and Wildlife (WDFW), and the City of Bremerton. The proposed…
READ MORE

Port of Bremerton 5-year Maintenance

The Port of Bremerton hired ELS for general permit development for maintenance at Port facilities. This involves acquiring permits for a 10-year maintenance program for Port facilities including a Nationwide Permit, HPA, and local jurisdiction permits/shoreline exemptions. The facilities include two boat ramps, two marinas, and a pier that are located within the jurisdiction of…
READ MORE

Small Cruise Vessel Dock

ELS was contracted by PND Engineers on behalf of the Port of Kalama (Port) to assist with the permitting required for building a dock for small cruise ships on the Columbia River in Kalama, Washington. This project consisted of building an elevated dock for cruise ship mooring that included a landing area, gangway, and tower…
READ MORE

Dark Fiber Project

ELS was contracted by the Port of Woodland to assist with permitting and critical area identification for a two-phase project. Phase 1 was the backbone of the project and included installing broadband fiberoptic lines on existing poles generally between Ariel and Cougar in Cowlitz County. Phase 1 was permitted in 2022 and construction was complete…
READ MORE

Haydu Park

ELS biologists provided mitigation installation oversight for the Haydu Community Park wetland mitigation site south of Norris Pit Road and Kalama River Road. The Park, which was constructed in 2014-2015, impacted riverine and depressional wetland buffers. ELS biologists continue to conduct the annual mitigation monitoring and reporting.  
READ MORE