ELS is currently contracted by Clark County Regional Wastewater District (CRWWD) to provide as-needed environmental services on a 6-year term (2019—2024). These services include environmental permitting strategy and support, wetland delineations, critical area assessments, and mitigation plans. ELS is part of the project team from the initial planning process advising on permit triggers, timelines, and…
READ MORE
Port of Bremerton 5-year Maintenance
The Port of Bremerton hired ELS for general permit development for maintenance at Port facilities. This involves acquiring permits for a 10-year maintenance program for Port facilities including a Nationwide Permit, HPA, and local jurisdiction permits/shoreline exemptions. The facilities include two boat ramps, two marinas, and a pier that are located within the jurisdiction of…
READ MORE
Well #6 Transmission Line Replacement
ELS was contracted by Kitsap Public Utility District #1 (Kitsap PUD) to conduct a preliminary critical areas identification for the Well #6 transmission line replacement. The project was proposed through an existing easement across the Lovgreen Pit on Bainbridge Island. Wetlands were present on much of the pit and there were streams leaving the wetlands…
READ MORE
Sakai Park and Trail
ELS was contracted by Bainbridge Island Metro Parks and Recreation District (BIMPRD) to conduct a wetland boundary delineation and delineation report at the Sakai Park property, which is in the heart of Bainbridge Island and near a high school. The property was an old farm property with a regionally important wetland and historical site. BIMPRD…
READ MORE
Gee Creek Trail Extension
ELS was contract by MacKay Sposito on behalf of the City of Ridgefield for permitting and constructing approximately 2,000 linear feet of the Gee Creek Trail from Abrams Park to Heron Drive. Gee Creek Trail is a component of the City of Ridgefield’s interconnected park, trail, and greenway system. ELS biologists delineated critical areas within…